Mr. President, I rise to make a short statement on the financial position of Petrotrin in light of
low refining margins over the past two (2) years and the recent precipitious fall in oil prices and
further shrinkage in refinery margin. Petrotrin lost $346 million (unaudited) in fiscal 2014 and
just broke even in fiscal 2013. This was due to losses by the refining arm of the company. The
upstream side of the company remained profitable in 2014.
Losses in the refinery are principally due to the collapse in the gross refinery margin. The Gross
refinery margin is the difference between the cost of a barrel of crude oil and the value of the
refined products that are derived from the refining of that barrel of crude oil. Gross margin, like
oil price is a variable, market related parameter, over which we have no control.
The fall in the gross refining margin at Petrotrin is a feature of a worldwide oversupply of
refinery capacity compounded by the shale oil revolution which has seen American refiners
benefit from cheaper crude oil and lower natural gas prices. As a result, US refinery utilization
rates in July 2014 peaked at 94%, the highest they have been since 2005. American refineries are
therefore more competitive than their counterparts outside of the United States.
These depressed margins have led to the closure of some sixty (60) refineries worldwide over the
last five (5) years, with a further eleven (11) currently being contemplated for possible closure in
other parts of the world. In the Caribbean, two (2) refineries have closed in recent years. In
Europe thirteen refineries have closed in the last five years.
Petrotin and indeed the country is not immune from this global scenario. Petrotrin is now also
facing the spectra of falling oil prices which jeopardises the profitability of its upstream business.
Oil prices have plummeted by more than 30% since 2014 June and are currently at their lowest
levels in four (4) years.
As a consequence, the company has cut TT $340 million out of its operating budget for fiscal
2014/2015 compared to fiscal 2013/2014. Even with this significant cut in operating expenses,
the company will still incur another projected loss in 2014/2015 at current oil prices and refinery
margins. Petrotrin’s salaries and wages costs, inclusive of benefits and allowances, are 54.5% of
its recurrent budget. This compares to the benchmark of 35 -40% for National Oil Companies
(NOC’s) around the world.
The other major challenge Petrotrin faces is the debt burden of the company.
In 2002, the total debt of Petrotrin was TT $3.3 billion. By 2010, when the former PNM
administration left office, it had increased almost four fold to TT $12.4 billion. The main driver
of the increase in debt burden in that period included the issue of two bonds, one in 2007 for $US
750 million and the other in 2009 for $US 850 million. These bonds were issued to support
projects in the refinery, including the Gasoline Optimization Programme (GOP), which
experienced significant cost escalation and schedule slippage. These bonds have burdened the
company’s expenditure.
As at December 1 st 2014, the company’s total debt (unaudited) is TT$14.38 billion. This figure is
comprised of TT$6.0 billion in short-term debt and TT$8.38 billion in long term debt. The
weighted average interest rate on total debt is 5.54%.
The repayment figure for the long term loan payments for 2014 is TT$1.26 billion and for 2015
that figure is TT$1.23 billion. In addition to falling refinery margins and falling oil prices, the
company must also contend with the servicing of its international debt obligations arising out of
these two bonds. The company has met these obligations.
Despite this, Petrotrin has never been a burden to the State and in fact contributes annually
between TT $2.0 to $5.0 Billion directly to the national coffers, and indirectly through
employees taxes to the state, support for a wide network of contract services and by being the
principal source of employment for a wide community of contractors and service providers.
All the analysis shows that the way forward for the company is to increase crude oil and gas
production and that can come from Petrotrin’s own efforts as well as from ventures such as its
Lease Operatorship, Farmout, Incremental Production Service Contract (IPSC) and Joint
Venture programmes.
Improved production is also expected to be realised from the company’s Trinmar Operations,
and more specifically, from the Jubilee field and the ongoing South West Soldado project. These
projects will take time to yield maximum benefits.
Additionally, the company is scheduled to retain additional drilling capacity in both its Land and
Trinmar Operations from 2015 January to improve its production and reserves position.
In the interim, Petrotrin must tightly control cost. To do otherwise would be to endanger the
company. We must not kill “the goose that laid the golden egg”.
Petrotrin has tremendous potential for increasing its oil production and is actively pursuing
multiple initiatives in this regard. It has started to put in place the building blocks to achieve this
potential.
By 2014 end May, the company had acquired 540 square kilometers of 3D seismic data in its
Trinmar and North Marine acreages in fulfilment of its new licence obligations and in its
ongoing thrust to explore for and exploit the resources entrusted to it by the state.Further, the
company had also acquired the largest 3D seismic data set on Land over its licensed acreage, 312
square kilometers and is actively pursuing exploration and development drilling leads in that
regard. The combined cost of the Land and Trinmar 3D seismic data set is $0.8 Billion TT
There are further plans for developmental drilling on land and in Trinmar in 2015. In addition,
the flag ship South West Soldado project is well advanced. The project comprises three (3)
phases, with total Capital Expenditure (Capex) over the next five (5) years estimated at
approximately TT$3.5 billion. Phase 1, which is currently in implementation mode, is estimated
to cost approximately TT$2.3 Billion Capex. It is estimated that incremental production from
SWS of approximately 6,000 bopd will be realised by end 2015.
Overall, it must be recognized that the company is at a sensitive stage in the implementation of
its turnaround plans. Its revenues have been impacted by falling oil prices and falling refinery
margins. At the same time it must service its debt especially the debt arising out of the two
international bonds of 2007 and 2009.
Petrotrin is one of this country’s major employers with some 4,300 permanent employees and
1,200 temporary workers on its payroll. The company supports a pensioner base inclusive of
spouses and beneficiaries of about 5400 persons. The company runs a medical system for
employees, retirees and their dependents totaling some 25, 000 persons and provides support for
numerous sporting and cultural groups around the country.
Mr President, this is a time when the employees of Petrotrin must continue to work towards
building the company. This is not a time for acrimony at Petrotrin. This is not a time to
breakdown Petrotrin but to build up Petrotrin. This is a time for the employees of Petrotrin to
recommit to the stabilization and growth of the company.
Thank you very much.